0 ratings
5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode
Item #: 13007133

5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V)

Item #: 13007133

XCD 44

Price Details

Excluding Shipping & Custom charges ( Shipping and custom charges will be calculated on checkout )

*All items will import from US

0 ratings Write a review
In stock
us Imported from USA store

QTY:

Order now and get it around Tuesday, August 25
Our Top Logistics Partners
  • fedex
  • dhl
U-Care Warranty:
None
Select a Plan
fast shipping

Fast
Shipping

free return

Free
Return*

secure packaging

Secure Packaging

100% original products

100% Original Products

pci-dss

PCI DSS Compliance

iso certified

ISO 27001 Certified


paypal payment
visa payment
mastercard payment

What Stands Out

High Brightness
These 3mm white blinking LEDs provide exceptional brightness, perfect for various lighting projects, ensuring visibility even in bright conditions.
Complete Set
Includes 100 resistors at 430 ohms, simplifying your setup for DC voltages between 6-12V, making it a complete kit for any DIY enthusiast.
Energy Efficient
Designed to operate at just 3V, these energy-efficient LEDs minimize power consumption while delivering reliable and vibrant flashing light.

Product Details

Shop 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode online at a best price in Anguilla. B077XB7NY2
Light TypeLED
Additional FeaturesInstant On
Bulb Shape SizeF20
Bulb BaseE26 Medium
Incandescent Equivalent Wattage50 Watts
Specific Uses For ProductGeneral purpose
Light Colorwhite, blue
Voltage3 Volts
Indoor Outdoor UsageIndoor
Power SourceDC Power Supply
Color Rendering Index95
Beam Angle120 Degrees
Power Consumption0.06 Watts
Light Source TypeLED
Light Source Wattage0.06 Watts
Accepted Voltage Frequency100 to 240 Volts and 50 Hertz to 60 Hertz
Control MethodTouch
Light Source Operating Life50000 Hours
White Brightness50 Lumens
Light Output Maximum50 Lumens
Controller TypePush Button
Connectivity TechnologyNormal bulb
Brand NameEDGELEC
Number of Items120
ManufacturerEDGELEC
UPC611355169030
Manufacturer Part NumberED_TC_YW05_6S/20Pcs
Included Components120 pcs LED Diodes, 200 pcs Resistors, 200 pcs Metal Film Resistors
Unit Count120 Count
Package Quantity120
Item Weight290 Milligrams
Item Dimensions W x H0.2"W x 1.14"H (0.5 cm)
Material TypeMetal
Shape5mm Round Top
Style Name5mm Constant Light
Color[01] 6 Color X 20pcs / 120pcs
BrandEDGELEC
Special FeatureInstant On

Who Should Buy?

Suitable For
  • Hobby Electronics

    Ideal for amateur electronics enthusiasts who enjoy DIY projects involving lighting effects and circuits.

  • Educational Purposes

    Perfect for educators and students to demonstrate basic electronic principles through hands-on experiments with LEDs.

  • Decorative Lighting

    Useful for crafters looking to add blinking light effects to decorations for events or home decor.

Not Suitable For
  • Professional Installations

    Not suitable for commercial use or professional applications where high reliability and consistent lighting are required.

Product Description

5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights LED Diodes (Colored Lens) Diffused Round Lens 29mm Long Lead +200pcs Resistors (for DC 6-12V) Included,Bulb Lamps Light Emitting Diode

Have any Query? Chat with us

Customer Questions & Answers

  • Question: How to Shop 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights Online From Ubuy?

    Answer: It’s easy to shop 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights online from Ubuy. You just have to search for the product, choose your shipping method while checking out and get it delivered to your location.
  • Question: Is 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights Available to Shop Online in Anguilla?

    Answer: Yes, at Ubuy Anguilla this product is available for you to shop at a reasonable price. The 5mm 6 Colors x 20pcs (120pcs) Assorted Colors Lights is not available locally but you can trust us with our express shipping services.
  • Question: How Long Does It Take to Get Product After Placing the Order?

    Answer: The delivery time of your ordered product varies as per what you've ordered and the shipping method that you've chosen. The estimated delivery time is mentioned during the checkout process, so be carefree while shopping.

EDGELEC Surface Emitting LEDs Editorial Review

The EDGELEC 100pcs 5mm RGB Tri-Color Red Green Blue Multicolor 4Pin LED Diodes Common Cathode comes with 300pcs resistors for DC 6-12V Included. The reviewers praised the product for being of decent quality and value, with a good range of colours. They also recommend using Ohm's law to calculate the appropriate resistor for the intended voltage. Customers note that the longest pin is the common anode and the shortest pin is the ground. A reviewer advises that if you want different colours as a fourth option, you would need to use an RGBW LED that requires five leads. Some customers complained that the LEDs were dimmer than expected and did not blink after wiring them, with some reviewers suggesting checking the voltage or looking at the diode's maximum current capacity.

Customer Reviews & Ratings

1 customers ratings
  • 5 Star
    0%
  • 4 Star
    100%
  • 3 Star
    0%
  • 2 Star
    0%
  • 1 Star
    0%

Review this product

Share your thoughts with other customers

Pros

  • Good range of colours
  • Comes with 300 resistor pieces
  • Decent quality and value

Cons

  • LEDs may be dimmer than expected

Platform Trust & Buyer Confidence

trustpilot logo
4.2/5 9250 + reviews
Read reviews
MA
Mohammad
Verified buyer

“Excellent quality and original too,when ubuy send original things I will appreciate that ,I very satisfied thank you”

23 July 2026 · via Trustpilot
CK
Chitra
Verified buyer

“The order and delivery progress was communicated very well. Package arrived within the estimated time. Products arrived as expected in good condition.”

22-Jul-26 · via Trustpilot
K
kund
Verified buyer

“Good supply of products. Safe payment methods, and shipment worldwide! Genuine products.”

23-Jul-26 · via Trustpilot
OO
Onesi
Verified buyer

“Was my first time buying a product from Ubuy, but I found it so helpful. This is reliable. Gonna place a new order!”

22 July 2026 · via Trustpilot
SJ
SAO JOHN
Verified buyer

“Ubuy is a great online platform to buy stuff. Reliable, fast delivery time and great value for money. I've been using Ubuy online shopping platform for three years now and will continue to do so.”

23 July 2026 · via Trustpilot
Secure Checkout Global Delivery Easy Returns Genuine Products

Product Price History

Important information

  • Limitations : For products shipped internationally, please note that any manufacturer warranty may not be valid; manufacturer service options may not be available; product manuals, instructions, and safety warnings may not be in destination country languages; the products (and accompanying materials) may not be designed in accordance with destination country standards, specifications, and labeling requirements; and the products may not conform to destination country voltage and other electrical standards (requiring use of an adapter or converter if appropriate). The recipient is responsible for assuring that the product can be lawfully imported to the destination country. When ordering from Ubuy or its affiliates, the recipient is the importer of record and must comply with all laws and regulations of the destination country.
  • Not all the products listed on Ubuy are for sale, as Ubuy is a global search engine. Products are subject to export/trade regulations.